Elkwater Fork Water Supply Dam

The $31,044,360.75 Elkwater Fork Water Supply Dam project project began in 2006 and the dam was completed for all intents and purpose in 2007 although contractual work continues into 2008.
Approximately 140,000 cy (cubic yards) of RCC in 76 production days along with 10,000 cy of conventional concrete.
Heeter Construction, Inc. has completed a very complex RCC [...]


Local Water Supplies (3 extension systems)

Heeter Construction, Inc completed the Local Water Supplies (3 extension systems) project. This $5,787,451 project ran through 2005-2007 and included 188,000 lf of water pipe.


Relocation State Rt. 10 Earling to Rich Creek at Man, WV

Relocation State Rt. 10 Earling to Rich Creek at Man, WV, (2005-2008)
This was a project of 2,601,807cy of unclassified excavation valued at $19,065,785, and contracted by the WVDOT/DOH and completed to their satisfaction.